RAS SEDR SHERATON

Location: 25 km south Ras Sdr- South Sinai, Egypt
Schedule: 20 Months
Contract Total Value: 2,300,000 L.E

Project Description

Total constructed area 16000 m2.
Main Building, 2 wings for the Touristic Room, Banquet Hall & Conference Hall.
4000 m2 for each wing and 8000 for the Main Building.
Heights varies from 6 till 12 m high for the Main Building Lobby, Banquet Hall & Conference Hall.
Underground Tunnels to connect buildings together.
Distillation Plant (Production Building – 500 m3 underground water tank-clarifying basin).
Power Plant (generator house 800 m2).

Concrete Plus Assignment

Sub-contractor for Concrete works (shuttering, bar-bending, concrete pouring, concrete leveling) using Concrete Plus scaffolding system and equipments for the whole hotel.

General Consultant

Wisers eng. Hassan Abd el Reheem